Ramp Construction Facts

  • Construction start date: October 1, 2008
  • Completion date: September 2009
  • 475 spaces being added on five levels
  • 1,076 total ramp spaces will be available when the ramp addition is complete
  • Architects: LHB Engineers & Architects
    Carl Walker, Inc.
  • Contractor: Knutson Construction Services

September 25, 2009
The DECC’s new parking ramp is complete!

Parking Update

September 25, 2009

The New DECC Parking Ramp is now open!

  • The new five-level structure is attached to the DECC’s existing ramp. The two structures will provide event attendees, downtown parkers and others with 1,100 enclosed parking spaces.
  • For our disabled guests, the new ramp includes 28 handicapped spaces. In addition, the DECC has added 16 permanent and 24 temporary handicapped spaces on the surface parking area adjacent to the City Side Convention Center.
  • The ramp is connected to the downtown skywalk system and will be connected to the new Arena via a skywalk in December 2010.

This site map shows the location of the new DECC parking ramp and construction site of the new arena. Click here to enlarge view